Utility Project with 3×77 Ton Boiler title make it

Elite Engineering successfully delivered a 3 × 77 Tons Boiler System with a customized turbine to operate the pumps, as part of a complete utility plant for a refinery project.
Our scope covered FEED, DED, and full fabrication of all pressure parts in our workshop.